Reports

Reports

On this tab, you can run a report on a unit or a unit group based on templates created in Trackd.

To run a report, follow the steps described below:


  1. Select a report template
  2. Select a unit or unit group (the list shows all the available ones)
  3. Specify the time interval. You can set it using 'quick interval' (tap the icon ) or manually. To specify the interval manually, tap the start and end lines, and select the required dates and time. If you select the quick interval Week or Month, the report is run for the last full month.
  4. Select the page orientation of the report
  5. Tap Execute report
The report is opened as PDF file. You can open it in a third party application, send by email or messenger and so on (the icon  in the top right corner of the screen).